Project
AmberAir modular air handling units have been installed during renovation and construction of the second stage of the Croatian National Theatre to ensure a steady supply of fresh and conditioned air to the workshops and warehouse spaces. These advanced units are designed to maintain optimal air quality and temperature control, creating a comfortable and safe environment for the theatre's various operational activities. By utilizing AmberAir's innovative technology, the theatre enhances its indoor air quality, contributing to the overall health and productivity of its staff and the preservation of valuable materials and equipment stored in these critical areas.
Year: | 2024 |
Project location: | Zagreb |
Works: |
Invento Ventilacija |